Hat Trick at Longbridge

O’Brien has won its third contract at Longbridge, Birmingham.

The team has successfully secured a contract for a boulevard landscaping scheme on West Works Way. The first visit has commenced on site with further landscaping visits in March to complete the seeding.

The Longbridge projects has been made up of three individual contracts including West Longbridge, Dalmuir Road and most recently West Works Way.

Below is a link to our earlier contract at West Longbridge which is part of one of the largest regeneration schemes in the UK.

O’Brien Infrastructure Works Progress at Old Rover Site, Longbridge

O’Brien Infrastructure Works Progress at Old Rover Site, Longbridge

O’Brien Contractors are delighted to be working with St Modwen, Wakemans, and Rodgers Leask on one of the largest regeneration schemes in the UK, at their exciting West Longbridge mixed use development site, next to the River Rea. Longbridge is a long-term £1 billion initiative to breathe new life into one of Britain’s most famous industrial areas. As home to ‘The Austin’, Longbridge was once Europe’s largest car factory and gave birth to visionary automobiles including the iconic Mini. Today, a new identity is being forged for an thriving mixed-use hub of workplaces, homes, shops, cafes, event spaces and parkland, where residents, businesses, students and visitors can live, work, study and play.

Our works include S38, S104 which consist of earthworks, full carriage/cycleway, utility services, storm/foul water drainage, and landscaping works to form green areas for public use. These works unlock building plots to allow future development to commence which will bring additional employment to the local area.

For more information on the development at Longbridge

https://longbridgebirmingham.co.uk/work/work-space/

Using the latest machine technology on site.

https://obriencontractors.co.uk/the-latest-technology-on-board-our-two-brand-new-ec220-volvos-in-action-in-the-midlands-this-week/

 

Bedford Town Park Project Vision Continues to Shape Up Nicely!

Bedford Town Park Project Vision Continues to Shape Up Nicely!

O’Brien started on site late 2021 to carry out works, including earthworks, multiple bridge constructions and hard and soft landscaping to create a brand new and very impressive town centre park and a greenway recreational area.

The scheme is really starting to take shape on this project site with the works on The Town Park and The Greenway showing massive progress on site.  The Town Park and The Greenway will connect the 4 new village communities together on this wonderful development when completed!

Our Project Manager said “The project is progressing well and we are beginning to see signs of the finished product. We have recently installed a new playground and the bulk of the planting works have been completed site-wide, the site team continues to work hard towards our completion.”

We have had some great weather in recent weeks, which has been of great importance for progressing the works on site.

It will certainly be very exciting to see the finished project completed in the next few months!

Bedford Town Park ProjectBedford Town Park Project

Old Saltleians RFC club house takes shape as the building frame goes up!

The Old Saltleians RFC training ground development is progressing at a pace, with the steel frame for the new clubhouse taking shape this week and completed ahead of programme, providing a great start for the building works.

Since starting on site in November 2021 we have completed the cut and fill works, earthworks, the foundations for the building and under the guidance of ecologists, the works to the existing pond and a new pond has been formed on site.

Whilst the weather over the last few months has created challenges, these have been overcome to keep the programme on schedule.

Keeping it Local and Recycling

To date we have brought to site over five thousand tonnes of recycled material avoiding the use of primary aggregates and recycled material has been sourced locally to reduce transport distance and impact on road users and the environment.

Materials were used to create the access road onto site as the first operation to provide access for construction works and avoid carrying debris onto the surrounding roads.

We are providing local staff resources for this project, achieving reduced travel times to site, meaning a decrease in travel time for staff, contributing towards reducing our emissions.

Community Relations

Fundamental to the success of the project is our ability to minimise impact and disruption to the local environment given the site’s location within a busy residential area with housing adjacent to the site.

Keeping residents informed is important and with this in mind a pre-start meeting was held with the local parish councillors and letter drops conducted to keep residents up to date on the works.

No complaints have been received.

Old Salteians RFC Project Overview

Works commenced on the project with a formal ground-breaking ceremony on 25 November 2021, for a 12-month duration to deliver a fantastic new facility for Old Saltleians, who are relocating due to HS2.

O’Brien are using our in-house civil engineering & construction expertise, along with our extensive sports development experience, delivering a turnkey design & build solution for the client.

The scheme includes a brand-new club house, associated access roads, car parks along with seven natural turf pitches and associated infrastructure. This will be a fantastic development for the club, the rugby, and local communities for generations to come.

The scheme follows on from our hugely successful scheme at Aston Villa training ground, which has been testament to our skills and capabilities when it comes to providing outstanding turnkey sports facilities.

 

ilities.

O’Brien Contractors win RoSPA Gold Award for fourth straight year

We won a Gold Award in the Royal Society for the Prevention of Accidents (RoSPA) Occupational Health and Safety Awards for the fourth year running.

We have won a Gold Award in the Royal Society for the Prevention of Accidents (RoSPA) Occupational Health and Safety Awards for the fourth year running.

We will be presented with the award during a ceremony at the Hilton Birmingham Metropole hotel on Wednesday, July 12, 2017. The award was achieved during a special year for family-safety charity RoSPA, as it celebrates its centenary.

Peter O’Brien, Managing Director of O’Brien Contractors, said: “Health and safety is sown into the fabric of our business and this is why we have made it one of our core values. We place great emphasis on minimising the risk of accident or injury to employees and sub-contractors, as well as members of the public. It is not just about staying compliant.”

O’Briens commitment to occupational health and safety has seen its industry-leading standards recognised with accreditations ranging from OHSAS 18001 to CHAS, Achilles Building Confidence (five star rating) and Achilles RISQS. 68% of its annual training budget was also dedicated to H&S training and 80% of their site operatives were also qualified to NVQ 2+ standard during 2016.

“It is always pleasing to receive recognition for outstanding achievement; especially rewarding when it is for maintaining an outstanding health and safety record over a sustained period of time.” said Peter.

Judges consider entrants’ overarching occupational health and safety management systems, including practices such as leadership and workforce involvement.

Julia Small, RoSPA’s head of awards and events, said: “The RoSPA Awards are the most prestigious in the world of occupational health and safety, and held in high regard around the world, as winning one demonstrates an organisation’s commitment to maintaining an excellent health and safety record. Achieving the standard required is no mean feat.

“This is a special year in the history of RoSPA, and we congratulate all of our winners in this, our centenary year”.

Leamington Spa to Romford in 5 seconds

Civil engineering and groundworks specialist providing earthworks and laser levelling services at Broxhill Sports Centre.

If your boss gave you the choice of travelling a minimum 5 hour round trip in the car, or to make that journey in 5 seconds at the click of a button, what would you choose?

Well, for engineering surveyor, Gareth Price and his team at civil engineering and groundworks specialist, O’Brien Contractors, that choice has become a reality, thanks to director, Mick O’Brien, whose investment in 3D machine control and Trimble Connected Community software, has dramatically reshaped the business.

In order to understand how the solution works, Finning News took up the offer from SITECH UK and Ireland’s Zoë Adnitt, to visit Mick at a new sports pitch project in Romford and then travel to O’Brien’s head office in Leamington Spa, all in one very long day.

The project itself involved the creation of a brand new 3G sports pitch and a multi-use games area (MUGA), constructed next to an existing sports centre. With very tight tolerances required to meet the exacting standards for the pitch, before the job was secured, the surveying team carried out an in house survey, modeled the whole project in 3D and then monitored it throughout the earthworks programme, as Mick explained:

Having proven the benefits of machine control on previous sports pitch projects, we have now gone to the lengths of setting up a new specialist division for this type of work.

“So in practical terms, our first aim with any project is to try and ensure that no material leaves site, eliminating the need and cost of truck movements. This is achieved by recycling good quality soils and designing in features like earth bunds to use material that would normally be classified as inert waste.

“Our challenge throughout this process is that we have to stick as closely to our design as possible, but you never truly know what you will unearth or how materials will compact, until you actually start doing the job.

“This is why you have to be on top of a project from day one. Typically before GPS enabled 3D machine control, we would have had to send a member of our team down to site on a very regular basis, which is a costly exercise when a round trip is 5 hours. This was the reason that prior to our investment in this technology, we tendered for jobs much closer to our base in Leamington Spa.

“This was obviously quite restrictive to our growth, especially in the more specialist sports pitch market. So by using two-way communication through the Trimble technology using the GPS network, the machines are able to tell us what they have been doing and we can see the daily progress onsite at the touch of a button.

“Equally, we can see the all important levels being achieved and therefore continually update our calculations around material movements, settlement and compaction. This means that Gareth, our engineering surveyor, can make relevant adjustments to the 3D model from his desk, delivering changes to the individual machines onsite, at the touch of a button, via the Trimble Connected Community.

“So what would be a round trip of at least 5 hours to our latest Romford project to upload a file from a memory stick or complete a survey using older techniques, is a 5 second file click and drag process, which is then sent through the cloud.

“In commercial terms, this approach has totally changed our capabilities and more importantly for the customer, changed the way a project is delivered. Our customers get a 3D design matching high quality finish, reduced truck movements, which pleases the local residents and a faster job, at a fixed competitive price.

“It really is a win win for both parties and a transformational journey from regional to national contractor for our business, I honestly don’t know how we could run a profitable job without it.”

So if you’ve got an earthworks project you’re looking to start, click here to talk to us about how we can help you generate cost and efficiency savings.

O’Brien Contractors sponsor road safety for another year!

Birmingham based civil engineering and groundworks specialist, O’Brien Contractors, has sponsored a Warwickshire road safety scheme

We have once again agreed to sponsor two local primary schools as part of the Warwickshire Road Safety Club. Membership of The Club is available to all primary schools in Warwickshire and is organised by Warwickshire County Council’s Road Safety Team.

The importance of road safety was highlighted by the Department for Transport’s latest research, released in June 2016, which found there were 22,137 people seriously injured in reported road traffic accidents across the UK in 2015, with 1,910 being children aged 15 or younger.

O’Brien’s Director Mike O’Brien will be visiting Our Lady & St Teresa’s this week to find out how road safety education can benefit the local community. Mr O’Brien, said: “O’Briens is a successful, family run business, with a culture of supporting our local community and charitable initiatives. Having seen the excellent work the Warwickshire Road Safety Club do in teaching young pupils how to stay safe on the roads, we were only too happy to sponsor the schools for a second year.” Mr O’ Brien and his brothers all attended the school on Windmill Hill.

The schools will run a series of road safety initiatives throughout the year including the Kerb Safe pedestrian training for 6 – 7 year olds.

Cubbington Primary School will also benefit from the sponsorship again this year.

Eleni Jenks, Assistant Headteacher of Cubbington CE Primary School, said: “The Road Safety Club is a great way to engage with our pupils and get them thinking about road safety. Through the scheme, they learn vital skills that will help prevent accidents and equip them with lifelong skills. We really appreciate the support provided by O’Briens.”

O’Brien Sports secure Broxhill Sports Centre contract

Civil engineering and groundworks specialist providing earthworks and laser levelling services at Broxhill Sports Centre.

We have been appointed JCT Design and Build subcontractor for the delivery of new facilities at Broxhill Sports Centre in Romford by local contractor Valuegrade.

The scheme is part of Havering Council’s vision to provide the community with exciting new sports facilities that will include a new full sized 3G football pitch designed and constructed to meet the requirements of the FIFA Quality Concept, multi-use games area along with a polymeric sprint track and car park.

Our work will include earthworks remodelling of the site to form a plateau level ready for the installation work.

O’Brien Sports prides itself on being at the forefront of technology and has invested in and operated state-of-the-art GPS and laser-guided earthworks plant for some time.

Mick O’Brien, Director, O’Brien Sports, who will manage the project, said: “Our earthworks team provide accurate calculation of material quantities, including those for cut to fill scenarios, enabling us to deliver clear, accurate and reliable information and advice to clients, before, during and after contracts.”

“Where possible, we create a design that incorporates as much of the site material into the project, reducing the need to dispose of materials to landfill. This helps us offer our clients the best possible price, whilst also minimising our environmental impact.”

“Valuegrade is a highly regarded main contractor built on a reputation of delivering quality and trust. We are delighted that they recognised our sports capabilities for the installation of this scheme.”

Tim Storrar, Valuegrade, said: “We are looking forward to collaborating with O’Brien’s and believe the time spent prior to work commencing on site has been extremely valuable with regards to managing out the problems that are normally associated with these types of schemes.”

O’Brien Sports offer a full range of sports pitch services, including:

  • Full design and build construction projects
  • Synthetic and multi-use games area (MUGA) pitches
  • Pitch renovations
  • Natural sports pitches
  • Total solutions for sports pitches

O’Brien Contractors awarded SME of the Year at the 2016 Celebrating Construction Awards

Our commitment to the Midlands has seen us awarded a SME of the Year at the West Midlands Celebrating Construction Awards in Birmingham

celebrating-construction-2016-winner-sme-of-the-year

With a long-established track record of delivering expert civil engineering solutions across the Midlands, we are proud to be named SME of the Year at the West Midlands Celebrating Construction Awards 2016.

We scooped the highly acclaimed award for investing in our people, focussing on improving customer satisfaction and adopting industry best practises across all areas of the business. We were also praised for our commitment to sustainability and maintaining an above industry record for health and safety.

Peter O’Brien, Managing Director, said: “A fundamental element of our success has been the commitment we’ve placed to the Midlands. We believe by focussing on the region, we can forge strong and long-lasting relationships with clients and our supply chain facilitating greater collaboration, essential in delivering projects successfully.”

Established in 1958, O’Brien has partnered with the region’s leading industry clients, including: Morgan Sindall, Aston University, John Sisk & Son, Kier Group and University of Birmingham.

Peter added: “It’s not just about consolidating your efforts into one area. We have continually invested back into the business so that we have a highly talented and knowledgeable team, operate the most efficient plant and technology, and benchmark against industry best practices, like Achilles BuildingConfidence – having achieved a 5-star rating in 2014. This regional award recognises the hard work and commitment of the whole O’Brien team.”

O’Brien Contractors appointed to Perry Beeches V scheme

civil-engineers-birmingham-perry-beeches-v

We have  been appointed to work on Perry Beeches the Academy Trust’s fifth highly-acclaimed free school in Small Heath, Birmingham.

The delivery of a £10 million primary and secondary school facility at the former Virgin Media Office Building and adjacent industrial units will feature a 3 storey extension, sports hall, football pitch, MUGA and car parking.

Appointed by principal contractor, Morgan Sindall, we will deliver earthworks and a host of ground works – including foundations, drainage and associated works.

Morgan Sindall is a leading UK construction, infrastructure and design company and our Operations Manager, Tony Mitchell, sees the new contract as an endorsement of the services provided to them at St. Modwen’s Longbridge Town Centre Phase 2 in Birmingham: “We are delighted to be working with Morgan Sindall on this important education project in Birmingham. The past year has seen us work closely with Morgan Sindall, fully understanding their standards, philosophy and objectives and we hope Perry Beeches V will strengthen our relationship further.”

We will draw on our technical expertise, which includes state-of-the-art GPS controlled surveying equipment and machinery, to deliver groundworks services in the most efficient method possible and with minimal waste.

“Our team is well-versed at delivering high-grade education facilities in a live environment having provided civil engineering services on 9 schools as part of the Priority School Building Programme in Coventry and this experience will be pivotal in the execution of the scheme.”

Established in 1958, O’Brien Contractors is a Midlands-based provider of civil engineering, design and build and groundworks services, as well as turnkey sports pitch solutions. Receiving the prestigious five star rating for Achilles BuildingConfidence accreditation in 2014 means O’Brien sits alongside leading names in the construction sector as suppliers of excellent quality work with a commitment to growth and sustainability.

Key projects and customers include the Nestlé factory and Number One City Locks residential building both with John Sisk & Son; Longbridge Town Centre Phase 2 with Morgan Sindall; Aston Student Village for Aston University; and the Primark retail distribution centre with Sir Robert McAlpine.

Picture Caption: Perdip Mann, Secondary Headteacher, Perry Beeches V School, Caz Brasenell, Primary Headteacher, Perry Beeches V School and Tony Fitzgerald, Project Manager, Morgan Sindall.