Old Saltleians RFC club house takes shape as the building frame goes up!

The Old Saltleians RFC training ground development is progressing at a pace, with the steel frame for the new clubhouse taking shape this week and completed ahead of programme, providing a great start for the building works.

Since starting on site in November 2021 we have completed the cut and fill works, earthworks, the foundations for the building and under the guidance of ecologists, the works to the existing pond and a new pond has been formed on site.

Whilst the weather over the last few months has created challenges, these have been overcome to keep the programme on schedule.

Keeping it Local and Recycling

To date we have brought to site over five thousand tonnes of recycled material avoiding the use of primary aggregates and recycled material has been sourced locally to reduce transport distance and impact on road users and the environment.

Materials were used to create the access road onto site as the first operation to provide access for construction works and avoid carrying debris onto the surrounding roads.

We are providing local staff resources for this project, achieving reduced travel times to site, meaning a decrease in travel time for staff, contributing towards reducing our emissions.

Community Relations

Fundamental to the success of the project is our ability to minimise impact and disruption to the local environment given the site’s location within a busy residential area with housing adjacent to the site.

Keeping residents informed is important and with this in mind a pre-start meeting was held with the local parish councillors and letter drops conducted to keep residents up to date on the works.

No complaints have been received.

Old Salteians RFC Project Overview

Works commenced on the project with a formal ground-breaking ceremony on 25 November 2021, for a 12-month duration to deliver a fantastic new facility for Old Saltleians, who are relocating due to HS2.

O’Brien are using our in-house civil engineering & construction expertise, along with our extensive sports development experience, delivering a turnkey design & build solution for the client.

The scheme includes a brand-new club house, associated access roads, car parks along with seven natural turf pitches and associated infrastructure. This will be a fantastic development for the club, the rugby, and local communities for generations to come.

The scheme follows on from our hugely successful scheme at Aston Villa training ground, which has been testament to our skills and capabilities when it comes to providing outstanding turnkey sports facilities.

 

ilities.

O’BRIEN ARE DELIGHTED THAT THEIR PITCH AT WINTERFOLD HAS BEEN FIH CERTIFIED!

Winterfold House School, synthetic grass hockey pitch has been awarded FIH Certification.

O’Brien Contractors who are FIH Certified Field Builders recently completed the design and build for the construction of the full-size sand dressed synthetic hockey pitch as well as a spectator area, black weldmesh fencing & floodlighting. In addition to this we constructed two porous macadam tennis and netball courts with floodlighting as well as access pathways and access road.

O’Brien Sports Director, Mick O’Brien, said: “We are delighted that the Winterfold House School pitch has gained FIH certification. Our sports division has been delivering top quality hockey fields for many years now and this certification recognises the professionalism, skill and high standards that O’Brien Contractors bring to all of our projects.”

FIH Certified Field Builders are companies that specialise in building hockey fields. The companies that achieve accreditation have a proven ability to construct fields to the international standards the game requires. They have appropriate in-house civil engineering expertise for the design and construction of 11-a-side and Hockey 5s fields, operate quality management systems to ensure consistency in their work, and provide comprehensive maintenance advice to their customers.

Only a small number of firms worldwide have so far achieved FIH accreditation award.

 

O’Brien Sports secure Broxhill Sports Centre contract

Civil engineering and groundworks specialist providing earthworks and laser levelling services at Broxhill Sports Centre.

We have been appointed JCT Design and Build subcontractor for the delivery of new facilities at Broxhill Sports Centre in Romford by local contractor Valuegrade.

The scheme is part of Havering Council’s vision to provide the community with exciting new sports facilities that will include a new full sized 3G football pitch designed and constructed to meet the requirements of the FIFA Quality Concept, multi-use games area along with a polymeric sprint track and car park.

Our work will include earthworks remodelling of the site to form a plateau level ready for the installation work.

O’Brien Sports prides itself on being at the forefront of technology and has invested in and operated state-of-the-art GPS and laser-guided earthworks plant for some time.

Mick O’Brien, Director, O’Brien Sports, who will manage the project, said: “Our earthworks team provide accurate calculation of material quantities, including those for cut to fill scenarios, enabling us to deliver clear, accurate and reliable information and advice to clients, before, during and after contracts.”

“Where possible, we create a design that incorporates as much of the site material into the project, reducing the need to dispose of materials to landfill. This helps us offer our clients the best possible price, whilst also minimising our environmental impact.”

“Valuegrade is a highly regarded main contractor built on a reputation of delivering quality and trust. We are delighted that they recognised our sports capabilities for the installation of this scheme.”

Tim Storrar, Valuegrade, said: “We are looking forward to collaborating with O’Brien’s and believe the time spent prior to work commencing on site has been extremely valuable with regards to managing out the problems that are normally associated with these types of schemes.”

O’Brien Sports offer a full range of sports pitch services, including:

  • Full design and build construction projects
  • Synthetic and multi-use games area (MUGA) pitches
  • Pitch renovations
  • Natural sports pitches
  • Total solutions for sports pitches

Lawrence Dallaglio, OBE cuts first turf at Warden Park Academy

Installation of a 3G synthetic surface for Warden Park Academy by sports pitch construction specialist, O’Brien Sports

World Cup winner and British and Irish Lions legend Lawrence Dallaglio, OBE, cut the first turf and officially marked the beginning of construction work on Warden Park Academy’s full size 3G multi-use sports pitch last week.

The installation is part of a continual investment by the academy to build on its 60 years of District, County and national reputation for sporting excellence.

The new playing surface is being constructed in collaboration with Notts Sports, leading specialist in the design, advice and supply of artificial turf for multi-sports and playgrounds.

O’Brien will install a 6,052m2 3G FIFA 1 star compliant surface, underground perimeter and lateral drains, granular unbound base, an airlastic loadbearing geotextile and shockpad, kerb edgings, perimeter fencing and floodlighting.

Steve Hillman, General Manager, O’Brien Sports, said: “We are absolutely delighted to have secured the project. The new pitch will provide students and the local community with the opportunity to participate in frequent sports activities; building confidence, self-esteem, academic excellence, character building, but also give them a platform to realise their sporting goals and ambitions.”

O’Brien Sports delivers natural sports pitches, such as those used for rugby, football and cricket. It also supplies synthetic and Multi Use Games Area pitches, with surfaces suitable for just about every sport and user – from professional sports teams to schools, sports clubs and communities.

Recent projects include a synthetic grass hockey pitch for Burton Hockey Club and a 3G synthetic grass football pitch – constructed to meet FIFA requirements – for Worthing Football Club.

New Ellis Astro hockey pitch opened by the Mayor of East Staffordshire

Civil engineering and groundworks contractor provides earthworks and sports pitch installation services at Burton Hockey Club in the West Midlands

The Mayor of East Staffordshire, Cllr David Leese cut the ribbon and officially opened Burton Hockey Club’s new full size synthetic grass hockey pitch at Shobnall Leisure Complex, Burton upon Trent.

The new facility, named after Peter Ellis, the former president and a member of the club for 50 years, was constructed by O’Brien Sports, in partnership with Notts Sports, and tested in accordance with “The International Hockey Federation (FIH).

It was Peter’s wish that the club obtained its own playing facilities and when he passed away, he made a generous donation that led to the formation of an Astro committee.

Building on Peter’s generosity, the committee raised additional money that provided support for a grant from Sport England and contributions from a number of other sources.

Ian Brown, Chairman, Burton Hockey Club, said: “It’s all a bit overwhelming that the dream that started five or six years ago – and enhanced by Peter’s legacy – has finally come to fruition.”

“It’s very exciting to have our own pitch for the first time since we formed back in 1889. We have always shared a venue or hired, so it’s the first time we have been able to call somewhere our home.”

Key to O’Brien’s success in securing sports pitch projects, including: a sand dressed hockey pitch at Burton Hockey Club, Christ’s College Finchley 3G football pitch, Gerard Buxton Sports Hub’s 3G football pitch and 8 tennis courts and Oswestry School’s hockey pitch has been their underlying commitment to invest in an earthworks team and the operation of GPS and laser guided plant.

Steve Hillman, O’Brien Sports, General Manager, said: “At tender stage our dedicated earthworks team liaise with both our internal estimators and our clients, and through accurate calculation of material quantities, we are able to deliver clear, accurate and reliable information and advice, before, during and after contracts.

By offering alternative designs at an early stage, we can create a solution that gives clients the best possible results financially and practically. We can also minimise our environmental impact by reducing plant movements and off site material disposal to landfill.”

“Once we are awarded a contract, our machine control expert models the designed earthworks profiles and uploads them remotely to the projects Dozers and Excavators. This then ensures that the plant is ready to work before it even reaches the site.”

If you’ve got a sports pitch project you’re looking to start then call us for a chat about it on 01926 423 918 or email us at info@obriencontractors.co.uk and we’ll get back to you soon.