Throughout the project we have had to work closely with an ecologist due to ecological issues and the presence of bats has also presented challenges on the construction.

Client Reference – “During the build process, we have maintained full occupancy within the home due to the flexibility of Pat Barrett and his team. Between us we have found ways to maintain safety but continue with day to day operations. Nothing has been too much trouble, any problems which have arisen during the build have been discussed and resolved with a minimum of delay. Schedules have been adhered to which has enabled the smooth transition from building site, to clients moving into a luxury care home.” Geraldine Smith – CEO – Coate Water Care Co Ltd