O’Brien utilizes the very latest technology to ensure a quality result and focuses on a partnering approach with value engineering being the foremost thought of all employees.
Established for more than 50 years, O’Brien is proud of its roots. With that pride comes the drive for continual improvement as well as long term investment in plant, staff skills, training and safety.
The construction of a new warehouse and external yard facility for Castings Plc, Brownhills. The initial bulk earthworks operations carried out by O’Brien Contractors required the remediation of the 23,000m2 site, including breakout of existing structures to crush for re-use and the cutting and filling...
Construction of a modular building and corrosion road at Jaguar Land Rover. The work carried out by O’Brien included infrastructure works, foundations, drainage and an entrance road to the new car parks of the modular building. We opted for trenchless pipe installation and utilised directional...
O’Brien was as acting principal contractor for the construction of a new 520 space car park with all site clearances and the removal of spoil to form a new “hill” for testing vehicles. Associated paths, lighting, CCTV and planting and the installation of an underground...
Construction of a new modular building, waste yard and foul drainage upgrades for Jaguar Landrover, Whitley, Coventry. The sub-structure element of the construction of a new 3 storey modular building for 750 persons and included all foundations and plinths to raise the building above the...
O’Brien Contractors’ works to the first phase of the redevelopment of the Northampton College site comprised a comprehensive earthworks package to cut and fill the site to enable works traffic to move unhindered as necessary and as directed by the Client. Phase One works comprised...
The project comprised of the construction of a “super brick manufacturing facility” for Hanson Brickworks. The substructures consisted of placing 10,000m3 of structural concrete, fixing 800t of reinforcement to pad foundations, machine bases and 22,000m2 of floor slab. A section of this floor slab was...
The project comprised of the construction of a “super brick manufacturing facility” for Hanson Brickworks. The enabling works involved lifting and crushing 20,000m2 of existing concrete and tarmac hardstandings, for incorporation within the works as a piling mat and as capping within the externals. The...
O’Brien Contractors undertook the project as Principal Contractor for a new Client, Aston Student Villages, set up to provide new high rise student accommodation within the existing Aston University campus, providing 3,000 new room accommodation. The 24 week enabling works package consisted of the diversion...
The construction of a synthetic “Mondo” 6 lane 400m IAAF and UK Athletics track with associated field facilities at Eastwood School, Leigh-on- Sea in Essex. Also included is a full size FIFA compliant football pitch on the infield. The works involved reduced level excavation, “cut...
The construction of an Operational Command Unit for West Midlands Police, Sandwell, West Bromwich. The two acre site comprises of a four storey building with reinforced sub and superstructures, concrete floors and car parking facilities. O’Brien’s works consisted of the removal of existing car park...
The construction of Aston University Student Villages. The third project secured by O’Brien Contractors at the University involves the upgrading pedestrian areas around the campus in order for the landscaping to compliment the new building development in the on-going regeneration of Aston University in Birmingham....
Construction of a natural turf pitch and MUGA pitch. Phase 2 involved the construction of the two new pitches: MUGA Pitch The project involved the design and build of a 5 a-side sports pitch. The work included site clearance and reduced level dig with cut...